Remote Nondestructive Testing of Unpiggable Pipelines

since 1999
  • Homepage in English
  • Homepage in Russian
  • Homepage in Spanish

Transkor-K LLC (Russia) for GAIL (India) Ltd.

November 2015

In accordance with the Agreement between LLC TRANSKOR-K (Russia) and Gail (India) Limited verification was conducted within 18th to 21st of October 2015 by excavation digs. The main objective of verification is to correlate the results from MTM report with the actual state of a 6” PIPELINE.

All the MTM anomalies have been confirmed. The state of the pipeline in the digs corresponded to the report with 95% (4.75/5) approval.